June 4th 2005
Chessie Loop Completed
Switch installed for South field
Everyone working on Ballast
Track and Henry's Telegraph poles installed
The Boss just showed up ( Karen)
Visitors showed up at 5:45 and received a ride
Tom, Bob Kevin, and Brad working on Ballast
Brad with another load of ballast
Brad and Norm are we done yet
The track crew stops for a photo
The first ride on the Chessie Loop
Thanks to the following people who help get this done so quickly.
Henry, Jeff, John, Brad, George, Jimmy, Brian, Ken, Norm, Tom, Bob, Kevin
This stretch of track runs along the CSX track
Rounding the last stretch